There are various formwork systems with which clean concrete job can be realized. A difference needs to be made right here in between the system construction as well as the call formwork put on it. The system building and construction generally includes steel or aluminum, possibly in combination with wood light beams. The product of the contact formwork establishes the structure of the concrete surface.

Pattern of plates, profiles and also tie poles

With in situ concrete, the structure components are made in the setting as they show up in the building. This is apparent, yet it is an important distinction compared to precast concrete, which is normally generated flat.

For shuttered surfaces, the pattern of plates or textured mats, the layout as well as the placement of the construction joints and the tie pins establish the visual, visuals result. This means that attention has to be paid to the place of the outlining of the building joints, the finish of the tie-pin holes and also the outlining of corners and links. Interest to the details from both a building viewpoint and also the execution method (constructional) is of the utmost relevance when designing tidy concrete.

For instance, chamfers on corners are usually used as a matter of course since this offers even more certainty that the corners are loaded without crushed rock nests. From a building perspective, chamfers can mar the design. Right angles are undoubtedly feasible, however call for additional focus when constructing the formwork, specifically when it comes to the prevention of concrete water leak. It is consequently important to make arrangements concerning these information in advance as well as to know the repercussions of the prices to avoid dissatisfaction after that.

 

Texture/ framework

In addition to the pattern of the formwork, the type of structure or alleviation structure is also an aspect to think about in the outcome. Is the framework developed via machining or formwork? Is there a penalty or coarse profiling of the surface area? In the field of formwork, virtually anything is feasible with the help of innovative, computer-controlled mold techniques and also 3D design, gave the building enables it. The fact that it is typically discarded up and down can affect the outcome. Advances in concrete technology, such as the growth of self-compacting concrete, are also making an increasing number of design possibles. Several possible relief patterns can be recognized with structural floor coverings of polyurethane rubber that are attached to the contact formwork

Among the special qualities of in-situ concrete is that it can be used to make huge monolithic surface areas. By gluing the framework floor coverings, these surface areas can be given with continuous relief structures.

When applying structures as well as alleviation frameworks in the surface, it is very important to take into consideration how the material will certainly walk around the edge. It is not always feasible to transform a structured formwork around the bend, as an example in the recess of a framework.

The panel seams, the tie-pin holes as well as the construction joints will certainly note on the surface. What this defining looks like is a choice that the developer need to make at an early stage and also include it in the job spec.

 

Call formwork.

The sheet product of formwork for clean concrete is generally made of timber, plywood, yet can likewise be constructed from steel or plastic. Ingenious mold methods are also possible with, for example, fabrics (see optimization of textile-formed buildings. When using absorbing plating, such as wooden parts, chipboard and also uncoated plywood, the concrete surface will certainly reveal fewer air bubbles as well as be much less smooth than with non-absorbent plating (steel and layered plywood) When it comes to non-self-compacting concrete mortar, the layout as well as construction of the formwork should think about enough space for processing as well as compacting the concrete mortar.

Use mold launch representatives is needed to prevent the ‘young’ concrete from being damaged during stripping. Especially with the profiling as well as corners, damages can quickly happen if there is attachment in between the contact formwork and also the concrete surface area. The ideal combination of formwork material and release representative is essential. A typical mistake is the charitable application of mold and mildew release agents. Excessive use of mold release agents causes stains as well as air bubbles externally. It is recommended to ask the supplier of the formwork product for advice and to check the suggested technique.

Joints and also joints

A shuttering panel can be composed of a number of plates. An important factor of attention is the securing of the panel joints as well as the panel seams. Leakage of concrete paste at the joints need to be avoided. Plate seams as well as panel joints can generate a graphic profile grid of the surface, through grooves or ridges. Given that a lot of concrete job can not be gathered one go, the place as well as detailing of the pour joints will need to be agreed ahead of time. Marking off put breaks within one component is not appropriate. If due to the elevation of the building component, such as high wall surfaces and also columns, pouring breaks are unavoidable, they can best accompany false joints or profiling.

Link openings, spacers and cover blocks

In wall constructions, the thickness in between both formwork wall surfaces, adjusting box and also closing box is repaired using a mix of tie rods and spacers. Spacers are hollow pipes with conelike ends; the connection rods are put through the spacers. Tie pins are required to soak up the horizontal mortar pressure. The stiffness of the formwork additionally relies on the tie-pin pattern. The higher the quantity center pins per m 2, the reduced will be the centerpen krachten. This suggests much less contortion of the support framework as well as much less possibility of leak at the center pin cone, the connection in between the spacer as well as the formwork. The cover cubes for the objective of the cover on the reinforcement need to be of such shape and also make-up that they do not become visible after demoulding. The color of cement-bound covering blocks should match the shade of the concrete surface.

Various other detailing such as profiling, edges and pour breaks

If profile laths are utilized at the area of plate seams to highlight plate patterns, the batten should have a shape that is quickly demoulded. When demoulding, it is better to leave the battens in the concrete. Elimination is easier later on, without harming the surface area. The profile deepness have to be taken into consideration when figuring out the concrete cover.

Edge seams are worthy of special focus. In the corners, the forces arising from pouring as well as resonance can be absorbed with special corner clamps. Pour breaks are typically inevitable. The position of the putting joint can be selected to ensure that the markings are much less obvious, or the joint can be stressed by a deepened profiling.